Purchase Requisition Release Problem

2881 Views

Hi All,

I have a release procedure set up, and the strategy pulls up correctly when a PR is made. When I view collective release from ME55, the PR's show up, and I am able to release line items from that screen. However, when viewing the PR from ME53N, in the Release Procedure tab there is no green check next to the release code with which to release the line. Also, if I do release the PR from ME55, I cannot go to ME53N and cancel the release from the Release Procedure tab.

I am a user with all security access, so it is not an authorization role problem. The release group is also configured to release by line item, so that is not the problem. I have set up other release procedures which allow the release/cancel release function from ME53N before... what could be the problem this time?

Thanks,

J