Hi All,

I have a quick question. I have a data source 'A' feeding targets "T1" "T2" via delta load. Now I will add a third target T3 but I need historical data as well.

The questions is: Can I do a full Load With Repair to T3 and at the same time can I go ahead with regular delta load schedule to T1 and T2?

So the main question is: if I run a "full load with repair" and "delta load" at the same time from the same source to different targets would they affect each other?

(Since historical data amount to T3 is too large I cannot hold the other targets' delta load)

I will appreciate any help with points.

Regards,