inspection point identification

Former Member
0 Kudos

Hai gurus,

1) How to create inspection point identification and make active for inspection point result recording.

2) How to create master record for physical sample in the system.

regards,

sekar chand

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Sekar,

Is the issue solved for you ?

Regards

Gajesh

Answers (5)

Answers (5)

former_member186399
Active Contributor
0 Kudos

Dear Sekar,

Please let me know whether you are using inspection point along with physical samples or just the inspection point only

Regards

Gajesh

Former Member
0 Kudos

Hai gajesh ,

i am closing the thread with full mark to you and i am posting the settings made during the sample

creation as separate thread.

regards,

sekar chand

former_member186399
Active Contributor
0 Kudos

dear Sekar

Please let me know what is the inspection point you are using.make use of 150. Have u activate physical sampling for the material. please let me know the setting you have done in detail

Regards

gajesh

former_member186399
Active Contributor
0 Kudos

Dear Sekar

Please find the answers to your query

1) Regarding Control key - It works as normal production control key itself. you can attach this control key to workcenter and default it. But make sure that the control key you are going to use for QM operation has configured with tick in Sheduling, Inspection required,cost , confirmation .

2) please let me know have you activated physical sample. also let me know in which transaction or scenario you are getting this pop up.

3) Inspection point indentification can be anything. it is asking for an identification. you can give as 1, 2 3, etc. this is only for identification purpose. if you want to check for earlier inspection result you can click on the Assigned inspection Tab and click on the any of the identification.

4) For inspection with inspection point sampling procedure is very important.i have already mentioned in my earlier posting ( 3) Sampling procedure with selection of inspection point as this mandatory)

Go to QDV2 In sampling procedure you have to select Free inspection Point* . The try assigning this to the inspection plan.

please let me know if you have any more issues

regards

gajesh

Former Member
0 Kudos

Hai gajesh,

Thanks for your continuous detailed reply.

i had made the setting as per your statement, i am getting the inspection lot but when i had selected the

inspection lot under T.C QA32 and when i do result recording i am getting the pop screen,

which ask for inspection point/shift number and tab with inspection point assignment.

so first i tried to give the data for inspection point where system is not accepting any thing and throwing

error msg as

These inspection points were either created manually, or automatically at inspection lot creation, if:

physical samples were created according to a sampling procedure

plant maintenance objects have to be inspected

how to correct the error.

regards,

sekar chand

former_member186399
Active Contributor
0 Kudos

Dear Sekar

please find the setting required for inspection point result recording

Hello ,

I will provide you with 03 inspection setting

At plant level in Customisation maintain the following

1) Plant level - Result Recording

2) Inspection point field combination : 100

3) partial Lot Assign : Partial lot and batch for each inspection point

4) Proposal for inspection point valuation : Maintain any of the selectedset coded you have created for 03 inspection or 04 inspection

Master Data Required

1) Maintain 03 inspection in MM02

2) Selected set for 03 inspection for the particalur plant

3) Sampling procedure with selection of inspection point as this mandatory

4) Maintain routing as mentioned below

1) Go to CA02

2) go to header

3) Maintain inspection Point as 150

4) Maintain partial Lot Assign as partial lot assignment according to plant default

5) At Operation level maintain a QM work center ( testing ) with Control key QM04 ( as per your requirement)

6) double click on the control key and go to Quality Management : Inspection points

7) Maintain Inspection point completion : Quantity , Valuation and confirmation ( as per your need , you can select other options also) press F1 and see the impact of each

😎 choose time related and keep Tfac 1 and Unit as HR ( As needed)

9) You can select quantity - related also and then maintain the quantity.

10) Selection the QM operation and maintain in the MIC with above said sampling procedure

At transaction level

1) create order co01, release and save . lot will be created.

2) Do the opertion confirmation if there is any operation mentioned in the routing before the qm operation

3) go to qa32.> result > you will get a pop of all the operation with yellow traingle mentioning QM is active in that operation. double click on the QM operation

4) pop will come for entering parial quantity, date time

5)enter the details, do the result recording

6) save, pop will come for confirmation of quantity

please let me know if you need more clarification

Regards

gajesh

Former Member
0 Kudos

Hai Gajesh,

Thanks for your valuable and detail reply,

i had worked as mentioned by you,but i need certain clarification on this.

1) in CA02 for in process operation whether the control key to be given as QM04 or in the work center

control key we have to give QM04 .

2) AT transaction level i am getting pop screen , in this it is asking for physical sample - what data to be given for this

3) How to give inspection point identification , this is the error msg given when i clicked

- Assign inspection point- in the pop screen

waiting for the positive feed back

regards,

sekar chand

Former Member
0 Kudos

Hai gajesh,

i have the following problem in the sample creation for inspection point.

kindly correct me where i had went wrong or the procedure for creating sample for inspection point.

Sampling procedure is not permitted for insp.point-related inspection

Message no. QD241

Diagnosis

You have attempted, when performing an inspection-point-related inspection, to use a sampling procedure which is not allowed for this type of inspection.

System Response

You cannot select this sampling procedure.

Procedure

Choose a different sampling procedure.

regards,

sekar chand

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Please refer the OSS note 139582.

Regards,

R.Brahmankar

former_member228481
Contributor
0 Kudos

Dear Sekar

In Routing of the header material for which you want to activate the inpsection Points ,

in CA02 in Header Screen ---> Parameters for Dynamic modifications/Inspection points.

Give Insp Point as --> "150" "Generated insp. point; quantity or time"

And keep Active 03 Inspection Type in MAterial MAster.

You will get the Lots in QA32 for result recordings..for details take help of QM consultant.

Regards

Raghu

Former Member
0 Kudos

Hai Raghu,

i had done what u told, i am getting the inspection lot but i get the error msg as

1)create inspection point identification and make active for inspection point result recording.

2) create master record for physical sample in the system.

waiting for positive reply.

regards,

sekar chand

Former Member
0 Kudos

Hi,

Go to qe23 to create master record for physical sample in the system.

Regards,

satyajit