Hi all,

I have a scenario that.service order is created in CRm linked with ECC,

so iam getting reservation in ECC currosponding to that service order.

when i plan with Fixed order qty (lotsize)and individual riquirement in ECC. i am getting PR relevent for that material reservation.( ican able to see in Pegged requirment)

i have other PR's which covers for safety stock.i want split PR which is relevent for safety stock and which is relevent for material reservation.

Question 1: can that safety stock coverd PR be a single PR ( if i set the master data Fixed order qty)

note : as reservation comes with fixed qty 1 i marked fixed lot size as "1"

Question 2: individual material reservation number required to be present in PR so that i will be have refernce while issuing against PO.How i can do it.

Question 3. to which table pegged requirement data stored.

Question 4: can i do config to make reservation number to get display in (relevent )PR in standard

Regards

s.suresh

Accepted Solutions (0)

Answers (1)

Answers (1)

muthusamy_sankaran
Active Contributor
0 Kudos

Hi,

Question 3. to which table pegged requirement data stored.

Question 4: can i do config to make reservation number to get display in (relevent )PR in standard

As per my knowledge the pegging - information in R/3 is dynamic and not stored in a table.

With the function module "MD_PEGGING" and "MD_PEGGING_NODIALOG"

you can similar results as in MD04

Regards,

Sankaran