Hi PPPI gurus,
I have created a control recipe destination with the following process instructions to be generated to send to our MES system via MII from ECC6.
Position Seq Instr Cat. Gen Scope
05 1 ZCONS_1 01 (PI_CONS)
06 1 ZPROD_1 02 (PI_PROD)
06 2 ZPH_CON 02 (PI_PHCON)
The PI_PROD and PI_PHCON are being generated correctly and PI_CONS messages are being generated for each BOM component but in addition I'm getting a extra PI_CONS message for the Header Material as well.
According to SAP Note 167151 I should actually not get any PI_PROD messages with the above config and would definitely not be getting this extra PI_CONS message.
Any ideas on how to get rid of the extra PI_CONS process message?
Thanks,
Ros