cancel
Showing results for 
Search instead for 
Did you mean: 

Create Costing sheet

Former Member
0 Kudos

hi....

how we create costing sheet?pls tell me all steps.

Thanks

Rekha sharma

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

thanks

Former Member
0 Kudos

Hi,

Use this path : Controlling > Product Cost Controlling > Basic Settings for Material Costing >

Overhead > Define Costing Sheet.

Here three things are required : 1. Calculation Base ; 2. Percentage Overheads Rates; & 3 Credit which you can seperately define

through the next stage : Define Costing Sheet Components.

In Define Calculation Base : Create New entries : Base ID Y001 - Materials and save. In details tab give the Raw Material Consumption A/c - Cost element A/c No. and save the entries

In % overhead Rates : New entries Z001 : enter your O/H rate ID and description and save. In details tab give valid from & to date 01.04.2008 to 31.12.9999 - CO Area - O/H type 1 and give 5%

repeat the same in next two lines for O/H type 2 and 3. Save the entries.

In Credit - New entries give ID C001 description : Mat O/H cost. In details tab give valid to 31.12.9999

the cost element for Material O/H and give the cost center to which the cost has to be captured.

Now coming back to define costing sheet -

New entries : give costing sheet ID CS01 and description. In the costing sheet rows tab give row No.10 for Base Y001 and in the coloumn Base enter Y001

Give row No.20 and choose coloumn Overhead and give Z001 and in from coloumn enter 10 and

in credit coloumn enter credit key ID C001. In the next line just enter a description Material Cost

and save the costing sheet.

This costing sheet has to be assigned to Valuation variant in the costing variant component for the

Plant. Further, you have to make entries in the cost component structure through OKTZ.

If you need more clarity please revert back.

Regards,

Sadashivan