Process messages

Hi, I have used process inst cat CONS_3, While entering the GI qty in co60, i observed that there are 2 lines to enter the qty and storage location where as actually there is one material only to issue to order. wht abt 2nd line, is it need to be completed or not and wht it represents? while filling co60, wht is the procedure. i mean first we should enter the withdrawn qty and storage loc, save and complete or first complete, save. pls advise.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Mar 27, 2009 at 05:35 AM

    Hi,

    That second line item is for your Header Material.

    I think you have assgin that PI catagory CONS_3 to your Control Recipe destination (O10C).Now go to threre and assgin Gen. of Scope 01 (For all Reservation).

    Then check it from new Process Order.

    Regards,

    Dhaval

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 27, 2009 at 05:27 AM

    Dear Yadav,

    Please check whether you have assigned the process instruction category twice in the phase.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.