Subreq in MRP

Former Member
0 Kudos

Hi Gurus,

I have created a subcontracting PO for the HALB and subsequently execute the MRP run for the HALB material. After MRP run, when i check the MD04 for the components.

I see 2 subreq lines in the MD04 list. One is under the plant level and one is under the subcontracting stock level.

Is this the correct behaviour? Previously, I run a another test in another client with similar settings. There is only 1 subreq line in the MD04 list under the subcontracting stock level.

Kindly advise. Thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

former_member581212
Active Contributor
0 Kudos

hi,

Before running, use the Special stock indicator for subcontracting in the MMR in MRP2 ..

Check it...

Regards

Priyanka.P