Skip to Content
author's profile photo Former Member
Former Member

backup by legato

HI Experts,

Could any one tell me how to schedule backup by legato. ( STEP BY STEP)

OS - Windows Server

DB= Oracle 9i

SAP- ECC 6.0

Thanks in Advance.

Sumit

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Mar 26, 2009 at 11:06 AM

    Hi,

    Check out following link.

    [http://dlc.sun.com/pdf/875-3426-10/875-3426-10.pdf]

    Hope this helps.

    Manoj Chintawar

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 26, 2009 at 11:56 AM

    there is nothing like "step-by-step" documentation how to set up a backup with Legato.

    There are various ways of doing Oracle backups (brtools, RMAN), depending on that you need to have different Legato clients installed.

    All those things are nicely covered in the installation guides on http://powerlink.emc.com.

    And btw: Oracle 9.2 is out of support already, you should consider upgrading to 10.2.

    Markus

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.