cancel
Showing results for 
Search instead for 
Did you mean: 

quality plan shud attached automatically .....

Former Member
0 Kudos

helloo ...

here i am using make to order stratergy , in this lot size created for perticular process order , I want after lot size has been created , QUALITY PLAN should get attached automatically to lot size for the perticular custmer .

pls reply me .

AMOL WAGH

Accepted Solutions (1)

Accepted Solutions (1)

former_member204463
Active Contributor
0 Kudos

Hi Amol,

Please activate the Automatic Assignment indicator for the specific Inspection type in the QM view of Material master. However, in case of multiple group counters, the insp plan will not get assigned. You need to do it manually.

Regards,

Keerthi.

Former Member
0 Kudos

dear ...

I have already activated auto asssignment indicator , still it is not picking inspection plan & also, i will narrate the in brief i have created inspection plan & assigned customer to that inspection plan. when i am creating lot for that customer inthat lot that customer specific inspection plan not appearing for manual selection also. if it won't get attach automatically to that lot then atleast it should appear for manual selection, in my case it is not appearing

waiting...

amol

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Customer assingment in the plan is usually for type 10 inspectoins

QPAP0001-Enhancement by using it you can achive this.

Pls assign the plans to a material/customer combination and use the user exit make the assignment automatically.

Regards,

R.Brahmankar

Answers (1)

Answers (1)

former_member196398
Active Contributor
0 Kudos

Amol,

You need to create Inspection using transaction QP01 for the required lotsizes and the usage like "5" - for GR like that. Once this is available during Inspection lot creation, automatically Inpsection plan would get assigned to the Inspection Lot.

Regards,

Prasobh