Former Member
Mar 26, 2009 at 06:39 AM

Maintenance Order has getting costing error.

350 Views

Hi,

I have getting costing error in maintenance order when trying to save showing the error message

No price could be determined for material/batch in plant 1594

When we looked at the MO error log it said - the system could not calculate a price for material /batch

in plant 1594 for valuation view 0, because none of the valuation strategies in valuation variant 007 was successful.

The material is having split valuation type COND-1 (Batch) and moving average price is maintained 0.5.

Material header level moving avarage price and standard price is not maintained.

I have checked the costing varient through transaction

OKP6 and all the settings are in place.

The settings are as below

Costing Varient- PM01-Maintenance order

costing type- 05 maintenance order

valuation varient - 007 production order-actual

In valuation Varient streategy sequences are

1. G Future price from accounting

2. 7 Valuation price according to price control in mat. master

3. 4 Planned price 1

4 3 Moving Average price

Please advice

Thanks in advance.

Regards

Harry