Transport a change number from PLM to R3

Former Member
0 Kudos

Dear all,

Anybody knows if it is possible to transport a change master number (from PLM system to another R3 system maintaining the change master number ? Or does it have to be created again within the destination system ?

Cheers

Olivier

Accepted Solutions (0)

Answers (1)

Answers (1)

ulf_petzel
Advisor
Advisor
0 Kudos

Hi,

you can transfer change numbers with the ALE capabilities available for ERP/PLM.

http://help.sap.com/saphelp_nw70/helpdata/EN/0b/2a61f1507d11d18ee90000e8366fc2/frameset.htm

There is even the so called Product Data Replication capability available on top of ALE if you want to transfer complete bills of materials, and classification, variant configuration, documents and materials related to it.

[http://help.sap.com/erp2005_ehp_04/helpdata/en/21/a4ce3b739adf5de10000000a11402f/frameset.htm]

Regards, Ulf.