We have a BOM for which one of the components is batch-managed.While converting the planned order to a process order , automatic batch for the components is not getitng assigned automatically.
1. In the material master , we maintained 3 batch entry in MRP2 view.
2. We have assigned the batch search strategy in the order type dependent parameters.
3. We have assigned stock determination rule and operation 3 and 5 and flagged batch determination in the goods movement batch/stock determination. This also includes stock determination rule.
Automatic batch assignment is not happening to the components.
Please advise if there is any setitng misisng in master data or configuration.
Thanks,
Manohar