Cost element is not assigned to a cost component

13810 Views

Dear All,

On trying to run costing for finished good having one BOM component, system create error in costing log as-

Message no-239-Cost element 954001 is not assigned to a cost component 1

On seeing details:

Cost element 954001 is not assigned to a cost component

Message no. CK239

Diagnosis

The system attempted to generate the cost component split for the material, but discovered that no assignment has been made in cost component structure Z2 for cost element 954001 and possibly for origin group .

System Response

The cost component split is incomplete. The cost of goods manufactured in the cost component split is therefore less than in the itemization.

ProcedureGo into Customizing for Product Cost Controlling and carry out the assignment for cost component structure Z2 and chart of accounts AICA.

where i am missing the required setting.

please guide

regards