Hi,

I am doing client copy first time. I have screen shots given by basis person who had installed the SAP R3.

I think some screen shots after exporting the data from production client are missing in these screen shots.

The system landscape is like below

Production Server

Client 500

Development Server

Client 300 as Quality Server

Client 200 as Development Server

I want to copy production client 500 to my Quality client 300.

Steps I followed are

1. On Production server client 500

SCC8 on production client 500

Selected profile SAP_ALL

Target System DEV

Background Server SAPPRD_PRD_00

Two files created as PRDKT00015 and PRDKX00015

What should be the next step?

Kindly help?

Raj

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Posted on Mar 26, 2009 at 09:44 PM

    Hi Rajkumar

    1st - how big is your Production Database? Client Copy may not work that great if the Prod Database is too big.

    2nd - the 1st thing you will want to do is to do a User Master data export out of you QA system, to be imported back in after the client copy. SCC8 - Selected profile SAP_USER. You'll get an import number that you will need to re-import.

    Ken

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Varun Chhibber

      I would say go for client export/import. If you go for client export import, you can have the client data and free from using production system

      You can as well go for remote client copy but the production system will start transferring the data to the quality. Remote client copy needs a decent network interfaces between source and the target.

  • author's profile photo Former Member
    Former Member
    Posted on Mar 25, 2009 at 10:46 AM

    Hii Raj,

    here is the procedure for doing client copy using export/import method:

    Client Export:

    1. Run SCC8

    2. Select Profile for desired copy type (Usually All [SAP_ALL] or user master only [SAP_USER]. You will need direction from the requester as to the correct selection here. Use Profile -> Display Profile to display profile details.)

    3. Select target System (or group)

    4. De- Select "Test Run" (If selected)

    5. Run Export

    - Up to 3 requests are created, depending on the data selected and available:

    1. "SIDKO00353" for transporting client-independent data, if you have selected this

    2. "SIDKT00353" for transporting client-specific data

    3. "SIDKX00353" for transporting client-specific texts, provided texts are available in this client

    6.Monitor TP logs for errors and export files for growth

    Client Import:

    1. Create client (scc4)

    2. Login to client (sap* - pass)

    3. Manually add "O" transport then "X" then "T" to TMS buffer

    4. Highlight #1 and use "Request -> Import" to launch import tool

    5. Monitor "I" file in OS "/usr/sap/trans/tmp" dir for progress info

    6. After Import is complete perform "post processing steps" from client tool (SCC7)

    So if you have 3 transport requests and the data has been exported successfully then go for an import in quality system

    Let me know of any issues

    Rohit

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 25, 2009 at 10:49 AM

    Hi,

    Follow the following Steps....

    1. This is remote Client Copy(for that scc9). One system to Another System.

    2. Create a RFC in Quality Server Client 300.

    (Put target System is Production Server and Mention Client Also)

    And then check Connection. - It should be OK.

    3.Now run SCC9 from Quality Client 300.

    Required---

    Selected Profile: SAP_ALL

    Source destinat: Choose created RFC.

    Then please Tick first TEST RUN.

    If it goes Successfull then Go for Next.

    • At the time of Client Copy No Other user shuld be login.

    Regards,

    Gokul Chandola

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 12, 2009 at 07:55 AM

    This message was moderated.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.