Mar 24, 2009 at 06:29 PM

Changing Resoure

21 Views

Is there a way to change the primary resource on a planned order in APO without it re-calculating the duration? So the only thing I want to change is the resource but keep the duration quantity and rate the same. The duration of a planned order is calculated by the variable duration in the resource, if I change the resource then a new duration is calculate if the variable duration is different.

Thanks

Rob