When the consolidation is being run for the Period 003 of 2009, we donot want someone has the ability to change the data of the previous period 001 and 002 of 2009.
Hence we want to lock these period during period 003 consolidation. How to lock these period in BPC. Is it handle thru work status settings or any other settings.