I have set up our solution manager to use trusted connections. If a user now executes a test case (say: MM01 - create material) it directly jumps into the test system and executes MM01. So far so good.
Behavior: as soon as the user completes the creation and saves the material, the mode/focus jumps directly back to the solution manager test workbench.
Problem: we would like to have the user note down the material number. This is not possible, because of the immediate switch/handover back to solution manager.
Questions:
1.) Is there somewhere a log which traces the tests, where one could find the material number?
2.) Is there a possibility to prevent the test system from handing over the focus to solman at once, so that the user could note down the system response (here: material number)?
Thank you!
Martin