Skip to Content
0
Former Member
Mar 23, 2009 at 02:04 PM

Test tracing - trusted connection and test case problem

39 Views

I have set up our solution manager to use trusted connections. If a user now executes a test case (say: MM01 - create material) it directly jumps into the test system and executes MM01. So far so good.

Behavior: as soon as the user completes the creation and saves the material, the mode/focus jumps directly back to the solution manager test workbench.

Problem: we would like to have the user note down the material number. This is not possible, because of the immediate switch/handover back to solution manager.

Questions:

1.) Is there somewhere a log which traces the tests, where one could find the material number?

2.) Is there a possibility to prevent the test system from handing over the focus to solman at once, so that the user could note down the system response (here: material number)?

Thank you!

Martin