Skip to Content
avatar image
Former Member

Test tracing - trusted connection and test case problem

I have set up our solution manager to use trusted connections. If a user now executes a test case (say: MM01 - create material) it directly jumps into the test system and executes MM01. So far so good.

Behavior: as soon as the user completes the creation and saves the material, the mode/focus jumps directly back to the solution manager test workbench.

Problem: we would like to have the user note down the material number. This is not possible, because of the immediate switch/handover back to solution manager.

Questions:

1.) Is there somewhere a log which traces the tests, where one could find the material number?

2.) Is there a possibility to prevent the test system from handing over the focus to solman at once, so that the user could note down the system response (here: material number)?

Thank you!

Martin

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    May 18, 2010 at 09:29 AM

    This has been solved via a SAP note.

    Add comment
    10|10000 characters needed characters exceeded