Hi,
I have a typical scenario.
We are building a EDW layer with write optimized DSO, so as to improve the load performance.
Earlier R/3 extrwactors are dirctely loaded to Some std ods.Now we have to build one Write optimized dso through which all the load should happen to BW.
In order to maintain the data in Both Std ODS and new DSO, i did full load from Std ODS. now when i shedule the delta load from extractor to EDW i get zero record from r/3 with info package, but In DTP i get more records to target (ie to new dso ) ,
How come the Info package brings 0 records from extractor, and DTP brings more records from PSA.
Is it because that i am loading the new DSO for the first time ??
Please clarify
Thanks
Vels
i