cancel
Showing results for 
Search instead for 
Did you mean: 

two questions of PS

Former Member
0 Kudos

No.1 I want to use milestone billing plan for MM invoice verification, before I confirm the the milestone event, in the PO the blocking indicator if valid, after I confirm the milestone, if I use ME23N to display the invoice plan in the PO, the blocking indicator is still valid, but if I use ME22N to change the PO, the blocking indicator disapear automatically, why? Why system can't do this automatically? Or do I need to configure something else to let system to update the blocking status automatically?

No.2 In material master's MRP3 view, there is an indicator field for material available check, its name is "cross project", can anybody tell me how to use the indicator? I have trired set the value 1, but it seems to be the same as the value " " when I do material available check in system. Can anyone tell me why & how to use it?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Andy

Ans for 2 : Cross Project-->It is availability check during MRP in project which detrmines/checks requirement from different projects.

for details refer

http://help.sap.com/saphelp_46c/helpdata/en/d3/a51112e32311d1a6ab0000e83235d4/frameset.htm

Regards'

Sujit