cancel
Showing results for 
Search instead for 
Did you mean: 

Import ABAP

Former Member
0 Kudos

Hi,

Recently, I reinstall IDES ECC 6.0 SR3. I wonder the different in the total number in Import Monitor jobs. In my first installation, the total number of Import Monitor jobs is 112. This installation fails. After formatting hard disk and perform reinstallation, I notice the total number of Import Monitor jobs is 89.

The only different I did between the two installation was the number of sessions and parallel job parameters.

First installation:

sessions=50

parallel job=3

Second installation:

sessions=40

parallel job=1

Can anyone explain why?

BTW, my environment is Linux 64-bit, MaxDB 64-bit, ECC 6.0 IDES-version.

Rgds,

Hapizorr Rozi Alias

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member493877
Discoverer
0 Kudos

Solved. The solution is to recopy the export DVD to hard disk.