Dear all,
During MRP any customizing setting required in system for stock (like stock in transit,stock at warehouse house, stock under quality inspection) checking?
My client required Four type of stock checking setting for the Raw material
-Stock at Plant level.
-Stock at Port which comes after few day at Plant
-Stock in Transit (From Port to Plant- On way Goods)
-LC stock
Can i check above stocks at the time of MRP run for my Raw Material?
Edited by: Maulik on Mar 22, 2009 4:46 PM