Hi,
I have an issue, really not worth to be thought of.. However, still since it is a client requirement, I am posting this issue..
I have a BOM, wherein consumables have been considered. The weight of these consumables have been 1 gm / 2 gm..
Since the price of the consumables is not known, planned price of Re 1 has been maintained. The std unit of measurement is KG.
When the costing run is executed, since the value is very negligible, the system is calculating 0 against the particular input..
Though we have suggested to ignore such items in BOM as such they should ideally go to cost center.
Is there a way to capture cost in low decimals?
Is there a way that such material is not costed with error and is able to be released?