Skip to Content
0
Former Member
Mar 20, 2009 at 05:50 PM

Material include and exclude for MRP

52 Views

Hi

I have a material X which is created for storage location 0001 and 0002 now i have two more storage location 0003 and 0004.

Now i want to extend the material to X to sloc 0003 and 0004 for sloc 0003 MRP should be excluded and for sloc 0004 MRP should be consider.

Can it be done through MMSC t code? if not please tell me which one and how to achieve the same .

Thanks in advance.