Spool List from MRP RUN

hi,

After i run MRP for a Plant , in the spool list i get a list of materials for which MRP has run.

There is another coulmn with heading Selection group, under which nos 1 to 8 are listed.

against each material some nos are displayed.

I am attaching the screenshot of the spool list.

Please refer to Link: [http://picasaweb.google.com/lyrojgeorge/Public#5315125239632521186]

Can someone explain what these nos relate to.

thanks in advance

regards

lyroj

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Mar 20, 2009 at 10:08 AM

    Hi,

    The details are the exception messages against the Materials.

    Check in MD05 & MD06.

    Best Regards,

    Siva

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.