Hi All,
Iam having a peculier issue.
One Production order created and released with 5 operations.All the 5 operations weredown loaded to external sytem-PDC (Tcode CI44 and the criteria is it will download only released order operations) through background job(scheduled for every 5 minutes).
Immediately after 5 minutes the the same 5 operations were downloaded to external system with different confirmation numbers.
Normally this is possible incase of Release of order-Execution of Read PP master data-Again Release of Order.In my case this was not happened, But even system sent two confirmation number for the same operation.
How this is possible...Is there is any scenario this can happen.
Regards
SB