Hi,

Currently we are using the SAP R/3 with version 4.72. I tried to workout the solution but could not hence I need your assistance on this. The business requirement is as below:

All the overhead cost centres should accept the costs through only some cost elements and not by all. For example there are three overhead cost centres e.g. OH1, OH2 and OH3 and 5 primary cost elements e.g. 200, 210, 220, 230 and 240 and 3 seconday cost elements 600, 610 and 620. All these have already been created in the live system and have been used for 4 years.

Now the business wants that the overhead cost centre OH1, OH2 and OH3 should be posted only by the primary cost elements 200 and 240 and secondary cost elements 610. If any user tries to post the cost to these overhead cost centres through any other cost elements other than the specified one, the system should not allow.

Now can you please advise a solution to fix this requirement.

Rgds,

BABA