cancel
Showing results for 
Search instead for 
Did you mean: 

inspection lot creation

Former Member
0 Kudos

Dear all,

I want to clarify one thing that my client having one scenario that he is having one material running in two lines (production versions).for that one line we need insp.lot ,but for other line we don't require lot.is it possible.

thanks in advance

regards,

prasad

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi,

Have u tried maintaining control key (with out inspection char required) in the routing for the prodn line which doesnt require inspection.

Have one routing with line 1 with control key requiring insp char required and routing for line 2 with out

insp char required.

Pl revert back

Regards

Venugopal

Former Member
0 Kudos

Hi

you want inproces inspection with 03/13 inspection type?

Are you using normal PP/PP-PI or Repetitive manufacturing

Are you using routing or rate routing?

Give more detail

thanks

Sami

Former Member
0 Kudos

thank u for your quick responce and we are using 03 insp.type and ours is pp-pi .

and we do not want inspection lot for particular line.

plz advise .

regards,

prasad

former_member186399
Active Contributor
0 Kudos

Dear Prasad

Another suggestion would be

1) Create an MIC keeping the control indicator as optional.

2) In QA17 maintain sheduling of Automatic usage decision with a periodicity of half an hour

3) Inspection will be created in both lines

4) The line where you need th inspection can go on doing the inspection

5) The line which do not need inspection Auto UD will take care of the inspection lots

Let me know your feedback

Regards

Gajesh

Former Member
0 Kudos

Hi prasad

There is one way out...

You can define two different Production versions.

For eacn production version maintain different Production line & storage location.

Now activate 04 /03 inspection type for the material.

Use a appropriete userexit

QBCK0003 Extended QM check for goods receipt

QPL10001 QM: Inspection lot creation - editing work area on creation

Develop a logic such that for a perticular Production line it will create a lot and for other lot auto 321 mvt will be takes place.

I have never tried this but this is just a thought.

Regards

Sujit S Gujar