Query regarding PM-PP integration

Hi Experts,

I want to know the Integration b/w PM and PP. how can i get the information , if our any equipment is under maintenance , then system should not allow to maintain production order

gaurav

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    Posted on Mar 31, 2009 at 04:06 AM

    Dear,

    let clear one thing dat the Equipement is work center for the PP and for Plamnt maintenance it is equipment only.When creating order or plan some maintenance work on that equipement which workcenter for the PP. In PP module der is standard functinality Capacity planning of work center in Routing when ur maintenance work is going on dat equipement den work center capacity get reduced due to ur maintenace work which will reflect in PP capacity planning. according dat reduced capacity planning production order release.der is no std functinality dat u can intimate the PP dat ur work center is in maintenance not use it. it will reflect in capacity planning of PP routing.According dat reduced capacity PP plan the production scheduling.

    Regards,

    Rakesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 19, 2009 at 11:32 AM

    Please refer the [thread|pp-pm-interation]

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 19, 2009 at 11:37 AM

    Hi,

    One main integration is what you have mentioned. Firstly, The production work center should be maintained in the equipment(machine) master--> location tab.

    Then while creating maint. order mention system condition in order header (0- for not in operation- should be ticked). Before that set it in customizing.Create system condition under General data-- -Main & service order. This will block the capacity of the production. And while PP order creation, they can not create order on booked dates, instead order will be shifted to next available dates.

    You can check that in capacity load.(may be cm50---not sure at the moment).

    Regards,

    Rajesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 19, 2009 at 11:50 AM

    Hi,

    1. You have to maintain the User Status for equipment "Equipment Under Repair".

    2. When you create the Work Order for particular equipment under repair you need to set the "System Condition" field as "0".

    Click the link for more information;

    http://sap-img.com/plant/integration-between-pm-qm-pp-in-sap.htm

    regards,

    Venkatesan Anandan

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 30, 2009 at 11:41 AM

    System would not prevent you from creating a PP order if the equipment (Prodn. work center) is under maintenance. Only the work center capacity will not be available during the maintenance period.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.