Hi experts
I have a question regarding HIBE material, which is operating supplies. When the total mrp run for this
kind of material, the system show no mrp list for this kind of material. But wen we run manually with t-code MD02, the mrp list can be seen . The parameter for total mrp run and manual mrp run is the same.
I am quite confused. Does HIBE kind of material not included into total mrp run? But when I checked planning file , this kind of material can be seen . And it is flagged with net change planning. And the parameter which I set for total mrp run is net change planning. So it quite confused me. Thank you for
your help in advance : )