Calculation Work in Progress error

90 Views

Hi Experts,

Basically I am PP consultant. Learning product costing.

Can anybody please solve following error.

While running T-code KKAX for Calculate Work in Progress I am facing this error.

There are values for cost element 50000000 that are not assigned to any line ID

Diagnosis

Not all values for the cost element are assigned to a line ID.

Procedure

Assign the cost element to a line ID. If you don't want to include the cost element in results analysis, assign it to a line ID of category N.

You can access a detailed list of unassigned cost elements as follows: Start results analysis in the individual processing mode (transaction KKA1, KKA2, or KKA3). Select the field Full log. Execute the function. On the next screen, choose Logs -> Parameter List in the menu. A list is generated. The unassigned values are shown at the end of the list.

If cost element "+++++++++" was shown in the message, this is because in the assignment of costs and revenues to line IDs, you have not used a cost element other than the full masking "+++++++++". In this case a presummarization eliminates the information on the cost element.