Guys
This is a scenario
Subcontracting pur req is created by System through MRP run for Material A
Material B is supplied as a component to the vendor
Pur req is converted to purchase order for material A
Then in MD04 for Material B - it is shown as SubReq
For Material B
Rounding Value and minimum lot size are maintained
Base unit of measure(KG) and ordering unit of measure(KM) are different
Problem is like this
When i create sub contracting purchase order for large quantities(Material A) say 2000 Kgs
Then Material B gets two requirements(SubReq) in place of 1
Say 500kg each where as desired one is single requirement as 500Kg
If i create for small quantities say 10 kg
Then I get only one requirement (SubReq) for Material B
Is it the effect of rounding value ?
What is the effect of maintaining both Rounding value and Minimum lot size ?
Please give your inputs
Thanks