Delayed Distribution Demand in SNP interactive planning

Dear Guru,

I am facing a problem in APO SNP concerning delayed Distribution Demand in the interactive planning and I would highly appreciate some help.

We are loading orders from R3 to APO SNP via XI. We use Idocs (type POAPS_SAVEMULTIPLE2).

The BAPI called by APO to load the Idocs is BAPI_IDOC_INPUT1 (which calls IDOC_INPUT_POAPS_SAVEMULTI2 and also BAPI_POSRVAPS_SAVEMULTI3).

The sending and the receiving locations are SNP markets.

The problem is that everytime, the availability/requirements date of the distribution demand is delayed of one week in the Sending location view.

In the receiving location view, the availability/requirements date of the distribution receipt is correct (Requested date + transportation Lead Time).

Have you got any idea of the reason of this ?

Thank you very much for your answer.

Rgds

Fabien

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Mar 19, 2009 at 09:23 AM

    Hi,

    Does anyone have even the beginning of an idea ?

    Thanks

    Fabien

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.