LTP : how consider material with mrp type ND

Dear guru ,

I have a material donu2019t consider for mrp using mrp type ND.

But also LTP donu2019t consider this material.

How can I consider this material for Long Term Planning ?

Does exist any workaround ?

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Mar 18, 2009 at 12:47 PM

    Hello,

    As far as the MRP type is ND, you will not be able to include such material in the LTP.

    Change the MRP type to PD for example. Then, with custom created Material Status you can include materials in LTP and exclude it from MRP.

    BR

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.