Cutover Upload - Work in progress (Inventory)

Hi,

We are going live very soon and hence are in the process of collecting Inventory cutover data.

In legacy we have found that there are some production orders for which all operations are not yet completed. Say, there are 10 operations for a particular production order in legacy out of which only 4 operations are complete till cutover date. Whether we need to create new production order in SAP for completion of remaining operations? If so, how to upload the materials for which only four operations are completed ?

What are the possible solutions for the above problem. Please advice.

Thanks in advance.

Regds,

Bijay

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Mar 18, 2009 at 08:18 AM

    hi

    you have to create all the process order from the begining eventhough the partial operations are completed and in the order you say the completed operations.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.