Skip to Content
0
Former Member
Mar 17, 2009 at 07:15 AM

Document reference in Production Order

48 Views

Hi,

My scenario is as follows -

There is a drawing number for each material produced in-house.

So when we are making a production order (manually or thru MRP) for each in-house produced material,

I want the drawing document to automatically appear in the production order. The drawing document

should also appear in the print out of the production order.

This is needed so that the shop floor people can refer to the correct drawing while executing the production order.

I am using document type - DRW

In the schedulling profile I have checked - Document links to BOM and also Material.

Kindly advise, how to go about this problem.

Regards,

Edited by: Vishal Saha on Mar 17, 2009 8:16 AM