Jul 12, 2018 at 06:05 PM

Can a supply area have multiple control cycles for a given part?

259 Views

We are planning to set each of our production lines up with a dedicated supply area to perform Kanban bin replenishment. Each production line has multiple assembly stations, with each station containing multiple material numbers in Kanban bins. Some of these materials are located in more that one station on a given production line.

Is it possible to set multiple control cycles for a given part in a specific supply area? If so, how is that done?