Skip to Content
author's profile photo Former Member
Former Member

Early allocation of numbers to Measuring point

Hi all,

While creating the measuring points, the system generated internal numbers get alloted to MP, though in creation stage.But I have not saved the MP and came out of the transaction. But my number got wasted and when try to create new MP a new number is getting alloted. How to prevent this?

((I don't want to lose numbers as these are in symmetry for two different systems and has to be corelated by us , as & when required.))

I didn't find any thing in customizing (like what we have for notification-early number allocation).

Please reply.

Raj

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Mar 16, 2009 at 02:16 PM

    Hi,

    You cannot adjust this through customizing, measurement document numbers are always issued early. If document not saved then that number is lost. Buffering can also cause gaps to occur in the number range.

    See note [307437|https://service.sap.com/sap/support/notes/307437] for a full explination on measuring document numbers. See note [62077|https://service.sap.com/sap/support/notes/62077] about buffering.

    -Paul

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.