Skip to Content

Release Stregty not Revoke

Dear All,

I create a PO and release.

Release Indicator i maintain 4 for both 1 & X .

Now after releasing the document once. I make some more changes e.g. Qty change.

It goes to 1st Version

but when i go to ME29N to release again,

system show me only msg that Doc# can not be released. even i make some change

but if i go to PO change and in Version management if i make final Version check manually then

only i able to release.

Problem is that after any change, System revoke release stregty automatically

please help me

Reagrds,

Pardeep Malik

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    Posted on Mar 16, 2009 at 01:14 PM

    Hi

    In that case deactivate version management, then any change which affects the value of PO will trigger new release. If version is active first you need to release the version, then only release strategy will be reset. You cannot release while new version is in progress.

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 16, 2009 at 01:09 PM

    Tolerance for value changes during release

    Specifies the percentage by which the value of the requisition may be increased (as a result of a change to the requisition) after the release procedure has begun.

    If the Value Change % Field is blank and if you set 4 as Changable Indicator, the system determined New Release Strategy after every change in your PO.

    Maintain some value in the Value Change % field, then the system redetermines new release strategy only if the change in value is above the limit given in that field.

    If the value change is below the Value Change % then system doesnt redetermine new release strategy

    Edited by: Paul Pandian on Mar 16, 2009 2:09 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear Pual & Parveen,

      thnks for ur valuable suggestion.

      but sir, i maintain 1% change in value in release indicator. But when i make double Qty, system still not picking new release stregty for this one.

      but New Version created.

      Even disable version management does not do any thing ! Same story Repeated

      please help me

      Regards,

      Pardeep Malik

      Edited by: Pardeep Malik on Mar 16, 2009 4:03 PM

  • author's profile photo Former Member
    Former Member
    Posted on Mar 16, 2009 at 03:40 PM

    Hi Pradeep,

    May be if you can go for option:

    2 - Changeable, no new determination of strategy.

    With this it will be sure that release strategy is trigerred only for the first time and subsequently you will not have any release.

    Best Regards,

    Prakash

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 16, 2009 at 06:24 PM

    Configure the release indicator changeable paramater to 6 which will enable revalidation of release strategy for any change even after the PO is printed.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 17, 2009 at 12:21 PM

    Dear All,

    I am unbale to find solve this.....problem

    i am closing the thread.

    Regards,

    Pardeep malik

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.