Hello,
When I try to run Altinn integration (as described in this note: https://websmp230.sap-ag.de/sap(bD1ubyZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=990728) almost every time I get an error in SM58: "Commit fault: com.sap.aii.af.rfc.afcommunication.RfcAFWException: alterna". I have tried to deregistrer the qRFC's in production but it still only works irregularly.
We have managed to get one "terminrapport" transfered to Altinn with a status reply of "OK". This leads me to believe that we have done the correct setup in XI.
We use SAP ECC 6.0 (SAP_BASIS 700, SAP_HR 600) and XI: SAP NetWeaver 2004s
If this does not belong in the PI forum, please move it.
Best regards,
Erik Schmelck