cancel
Showing results for 
Search instead for 
Did you mean: 

Depot Stock posting at golive period

former_member206976
Active Contributor
0 Kudos

Hi,

Can anybody give me advise on depot opening stock posting procedure before go live of project.

regards

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi bvdv,

Here if you need to capture excise invoice(reciept) using the t-code J1IG to update RG23D register from MM side. And SD end issues will be updated in RG23D register using the t code - J1IJ.

With the help of abap consultant look for BDC programing to upload RG23D register for receipts, but to update RG23D register for issues you need to manually refer respective bill of entries for each issues.

Thanks,

Swamy H P

former_member206976
Active Contributor
0 Kudos

Thank you very much my problem has solved.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

You can try the following:

1. TCode MB1B movement type 561

2. Do a PID and post the count. TCodes MI01 and MI11.

Any way you choose, you need to consult with your MM colleagues.

Let me know if this helps.

Arnel