Hi,
We have a Production order which has various operations (say 5) out of which only 3 are confirmed. So far there is no output that is confirmed. So production is zero units.
Now, When I run the WIP, I can see that the operations that have been confirmed have been correctly included in WIP. But the figure of WIP is consolidated for all operations.
Where can I see operation-wise WIP?