Hello all,
When I try to create a cost estimate for a material using CK11N I get this message "No itemization exists for material XXXX in plant xxx"
If I enter on the message I get another message in the log "BOM XXXX /alt. 1 /usage 1 has no items relevant to costing"
I have checked the BOM for the above material and it is Productive and valid. I have also checked the materials in the BOM and they are all relevant to costing (the "relevant to costing" indicator is 'X')
What might be the reason for the above 2 messages.
Any help will be appreciated
Thanx