safety stock

10 Views

Hi all,

In my scenario i got "minimum stock level" .initially i thought it can be mapped in safety stock in MRP.

But the client requirement is that every month Minimum stock level (MSL)will be changed and .MSL will be replenished after order creation.

eg. reservation ->PR ->PO then msl will be updated.

But in normal (MRP)planning net requirement calculation calculates for safety stock then creates PR

our case is safety stock should not be consumed for PR it should be as such in MD04 . apart from that PR should be generated for every Meterial reservation i creates.(i did using individual/collective indicator=1)

And is there any way of maintaining MSL which can be reciept from another location with out PO.

In normal planning safety stock also will be planned and one PR will be created to maintain that safety stock.