on 03-10-2009 7:10 AM
hi experts.
i'm getting Error message . while doing settlement in ko88 (processing type - Automatic)
Define a settlement cost element for receiver type SDI
Message no. KD506
Diagnosis
In allocation structure A1 (controlling area P001), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type SDI.
Procedure
Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Go to -> Settlement parameters), or maintain allocation structure A1.
if i need to create cost element means, under wat category, i have to create
where i should assign this???
give me some solution ???/
thanks in advance
Hi guy,
You should maintain allocation structure in SAP. Run T-CODE OKO6 to maintain it.
BR
Thomas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
thanks for your reply
i seen that allocation structure . to assign cost element in source.
but for to select source, system asking ASSIGNMENTS . which assignment i have to select..
ASSIGNMENT:
010 Personnel costs
020 Raw-/service material consump.
021 Job work costs
030 Other costs
031 Stock change costs
032 Stores and spares costs
033 Fuel and electricity costs
040 Secondary costs
050 Revenues
thanks in advance
Hi Prakash,
You create a Settlement Profile and assign allocation structure to it. settlement profile contain the default cost object and other allowed cost objects to which the cost can be settled.
Now how system does the settlement to the respective object is based on the parameters defined in allocation structure.
The allocation structure contains:
1. Source of costs (as u mentioned in various headings like personal, admin cost etc)
2. You need to define there the details of the source of the cost (means the cost elements from which the cost is captured)
3. there itself you need to define how those costs need to be settled. whether by secondary cost element or by original cost elements
4. Once you define, then you are good to go with the settlement
I hope the settlement profile already defined in the order types
Please let me know if you need furhter details in this regard
Best Regards
Surya
hai experts,
thanks for your reply
For settlement of production order . my receiver type SD1 - make to order scenario .
so i need to create one primary cost element with category 22. which is should be the G/L account.
Can u tell me that will be wat G/L account ???
so that i have to assign that cost element in allocation structure in SD1 receiver type account assignment cat
correct me if im wrong ..
thanks in advance
User | Count |
---|---|