hi,PM experts
i have a question about the stategy plan in PM?
i have ceated a strategy, the detail is:
pakage level
7 days 1
30 days 2
360 days 3
and i created a strategy plan use this strategy
call horizon is 90%
period: 2 year
when i use IP10 to run the plan
i got a list of calls
but i found a problem:
in level 1 the call date is 1 day before the schedule date
but in level 2 there is no lead-time between call date and schedule date,this means the call date
is same as the schedule date
in level 3, the problem is just as level 2.
My question is why the level 2 and 3 have no lead-time in the call date?
Thanks for your helps