on 03-08-2009 10:08 AM
HI,
I require to have a check at the time of creation of delivery order, the quantity mentioned by the user for creating delivery are really available as unrestricted stock. if not, then the system should give an error mesage and won't allow to create the delivery.
This check is available at PGI level but can it be done while creating delivery?
Thanks & Regards,
Shibaji.
Hi,
maintain Quality Management tab in MM01 for that material and activate the fields like
Post to insp stock
documentation required
inspection interval
plant specific mat status
QM process active
QM control key
catelog profile
QM mat auth
inspection set up
but to do these settings u need lot of customization settings in IMG,
consult with QM consultatnt.
regards,
sk
Edited by: Sadanandam Kasarla on Mar 9, 2009 6:25 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shibaji
For your requirement , if you want to have a QM check at the time of delivery creation only then for that material , in MM02->quality mgmt tab-> you need to maintain and assign the quality check at delivery creation only .
Regards
Srinath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
10 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.