In a business scenario we are using two types of BOM 1. Production BOM & 2. Engineering BOM.
Letu2019s say for Material 'A' there is an engineering BOM & it consists of two components say 'B' & 'C'.
Material 'C' has its own BOM but with usage "Production".
Still in transaction CS03, when we display Engineering BOM (Usage: 2) for Material A.
Assembly indicator for material 'C' is active though there is no engineering BOM for material 'C'.
Is there is any condition for checking BOM usage for assembly indicator? Or what can be the solution to take into consider BOM usage.
PP gurus please help.
Many thanks in advance.