Skip to Content
0
Former Member
Mar 06, 2009 at 10:19 AM

Reuse of reworked material.

25 Views

Dear Friends,

Help me to solve the below query:

A product has two operations 0010 Milling and 0020 Assembly process. There is inprocess inspection between these two operations.

There are only two storage location RM store and FG store. RM will be issued to line from RM store and FG will be collected at FG store.

There is a production order for 10Nos.

Now, assume in opn 0010, 5 nos are to be reworked. Automatic rework order will be created using trigger points.

Now after rework confirmation, i want to use these 5 pcs into OPN 0020 confirmation.

Is this scenario possible, what settings i need to make to achieve the result?

Thanks and regds

Sridhara K N